Vol. I  ·  Wednesday, April 8, 2026

Stewart J. Cort stuck in St. Marys River pack ice blocking upbound traffic

Published by Chris Izworski  ·  Founder, Great Lakes Gazette  ·  Apr 8, 2026

Correction: Corrected September 17, 2026: the water-level paragraph was withdrawn because this imported legacy edition does not retain its underlying gauge snapshot. Its numerical readings and navigation implications are unverified. NOAA measurement context.

AI-generated briefing from linked source data, with automated editorial checks. Source feeds and summaries can be incomplete or mistaken. Verify time-sensitive details with the original provider. Report a correction.

The Stewart J. Cort remains hove to in pack ice near the Stribling Point turn in the St. Marys River, unable to complete her upbound passage for a second consecutive day despite icebreaker assistance. The 730-foot self-unloader got stuck Tuesday evening and, as of 8:30 p.m., showed no signs of breaking through the plate ice jammed behind Neebish Island. The USCG Mobile Bay is similarly stalled alongside her, both vessels waiting for conditions to improve by morning. Until the Cort moves, all upbound traffic is locked solid , a backup that includes the James R. Barker, Algoma Guardian, Wilfred Sykes, the saltwater vessel Belzitza bound for Sault Ste. Marie’s Export Dock, and tug Victor.

Ice conditions in the East Neebish Channel have been the story of the early navigation season. Monday’s traffic was steady, but icebreakers Federal Nagara and Mackinaw were required throughout, especially at the Stribling and Johnson’s Point turns. By late afternoon, Soo Traffic had to close the river above the locks between Light 26 and Whitefish Point after a northwest wind shift moved massive slabs of plate ice into the channel. The shortest winter closure in history , just 69 days, from Jan. 12 to March 22 , meant an unusually early and aggressive spring thaw, but residual ice is proving stubborn.

The original water-level paragraph has been withdrawn. This legacy edition was imported from a WordPress draft without the underlying gauge snapshot, so its numerical readings and navigation implications cannot be verified from the archived source data.

At Port Gypsum in Tawas, the Calumet tied up Monday morning after marking the season’s first gypsum dock arrival. With tug Kimberly Joy fresh from Cheboygan to set channel buoys, the loading operation began right on schedule , a bright spot amid the ice delays upriver.

About the Author
Chris Izworski is a Bay City, Michigan writer and the founder of the Great Lakes Gazette, a daily maritime news publication. He also publishes Michigan Trout Daily and operates the Michigan Trout Report.
Also by Chris Izworski